Multiple modification of previously allocated windows
It is possible to modify all windows of the same type while maintaining the area assigned to it with the previous model.
To do this, the Assign/View Materials section must be accessed.
and select the type of window item:
 
It is then necessary to access the Project Materials register by using the button
.
 
The list selects the Window model to be replaced (to see where they have previously been inserted into the drawing, we press the button
and all the walls and/or facades containing it will be selected). 
To replace it, you will need to select a new model in the Descriptor window on the right and finally press the button
.
 
Double-clicking on a window shows that the surface of the window has not changed from the previous model it had assigned.
Related Articles
 
Automatic calculation of serial projects (batch processing)
WithCadnaAeit is possible to automatically calculate a mesh or individual receiving points for different projectsin series. This is the type of batch processing. The steps needed to configure batch processing are explained below: Change Command by ...
 
Allocation of forges and ceilings/coverers
When allocating a forging on a floor plan, the forging will be allocated on the plant being intervened. The ceiling/cover of that floor plan will be omitted from calculations when a higher floor plan is created and a forging. The forging on the upper ...
 
Error: SONachitect cannot communicate with the OpenGL layer
Depending on which computer model/graphic card, the following error message may appear when you run SONarchitect: This is because the graphics card of the respective computer is not compatible withOpenGL(require to run SONarchitect). The problem can ...
 
Can a material be modeled on Insul from the R and Rw results obtained in laboratory tests?
InsulIt feeds not on acoustic data, but on physical data. In order to find the sound reduction index (R) of a constructive solution,Insulis based on the physical characteristics of the materials that make up it (thickness, density, Young module,...). ...
 
Change the color of buildings by exceeding sound limits
It is common for different areas with their respective soil uses, each having sound limits for the different time intervals (Day, Afternoon and Night). For example, like the project below: To represent the building of a particular color, depending on ...